G-Eco heat pumps for Mall of Tripla’s energy recovery system
Located in Central Pasila, Helsinki, Mall of Tripla is one of the largest shopping centres in the Nordics by number of stores. Photo: Vadelmavene (Wikimedia Commons)
Gebwell G-Eco heat pumps take efficiency and reliability to a new level
A major upgrade of the energy recovery system has been carried out at Mall of Tripla. The system was updated to meet today’s requirements by replacing the existing heat pumps with new units. The project aimed to improve energy efficiency, increase energy production capacity, and ensure reliable operation well into the future. Eight R290-based G-Eco Pro 120 heat pumps were installed in Mall of Tripla’s energy recovery system.
What does the upgrade mean in practice?
Stepless capacity control and improved performance As part of the upgrade, Gebwell Oy’s Finnish-made heat pumps using the R290 refrigerant were installed, enabling stepless capacity control from 50 to 1000 kW. This smooths system operation and significantly increases energy production.
More heating and cooling energy for the entire property complex Following the upgrade, the Mall of Tripla complex can produce more heating and cooling energy than before, reducing the need for district heating and district cooling. As part of the project, the heating networks of the five-storey Triplaparkki parking facility were also connected to the same energy recovery system.
Improved reliability Instead of two heat pumps, the system now consists of eight separate heat pump units. A higher number of units improves overall system reliability.
Fast, controlled implementation Thanks to prefabrication and preparations, the downtime was limited to four weeks. The removal of the old system and installation of the new one were carried out efficiently, minimizing the impact on day-to-day operations. Project partners visiting the technical room in October 2025. Photo: Mall of Tripla
Collaboration and project management
The project succeeded thanks to careful planning and close cooperation between all parties. Granlund Oy was responsible for design and construction management, Gebwell Oy supplied the heat pumps, and Cervi Oy carried out the piping, electrical, and ventilation works. Uudenmaan Automatiikkahuolto Oy delivered the automation solution, ensuring reliable operation and enabling continuous monitoring and further development.
Project realities and risk factors were reviewed together with the contractors. Prefabricated pipework supported a fast lead time and occupational safety, and strong teamwork combined with quick decision-making enabled the project to be completed up to a week ahead of schedule.
Summary
The project is an excellent example of how technical innovation, careful project management, and seamless collaboration can together improve energy efficiency and ensure reliable operation. The system upgrade supports Mall of Tripla’s long-term strategy to further develop sustainability and energy efficiency.
Text: Mall of Tripla, edited by Gebwell Photo of partners visiting the technical room: Mall of Tripla Aerial photo of Tripla: Tripla 2019-09-18 — Joneikifi (Wikimedia Commons), CC BY-SA 4.0. Modified: cropped. Photo of the Tripla entrance: Mall of Tripla — Vadelmavene (Wikimedia Commons), CC BY-SA 4.0. Modified: cropped.
More references
-
Commercial and industrial buildingsThe Urban REDI is heated using Gebwell’s district heating solutions
Gebwell delivered the largest single set of heating and cooling solutions in its history for the REDI shopping centre. This will be completed in…
-
Commercial and industrial buildingsTwo-way district heating at Sokos Hotel Vaakuna block in Joensuu
The Sokos Hotel Vaakuna block in Joensuu has implemented a two-way district heating system. The property, which includes the hotel, seven restaurants, and a…
-
Commercial and industrial buildingsNokian Panimo brewery’s logistics centre heated with environmentally friendly geothermal energy
Chosen heating solution: the climate-safe Gebwell G-Eco heat pump The new logistics centre of Nokian Panimo brewery, completed in spring 2025, is heated with…
Planning a project like this?
Tell us about the building and capacity need and we will respond with sizing.
Request a quote