Leppävirta’s new rescue station, which operates round the clock, is heated using ground source energy
Leppävirta’s new rescue station was commissioned in August 2026. The new building, covering approximately 1,770 square metres, serves the area’s rescue services round the clock and provides modern facilities for rescue personnel, paramedics and equipment alike. Gebwell’s ground source heat pump system is responsible for heating and cooling the building.
The energy solution was chosen on the basis of life-cycle costs and climate targets
According to Reino Pyyn, Head of Construction for the North Savo Welfare Region, ground source heat was chosen as part of the region’s climate targets and a comparison of energy solutions for new developments.
– We always aim to assess whether ground source heat is suitable for a new development. For this project, the additional cost of ground source heat compared to the alternative heating solution was around 160,000–180,000 euros, and the payback period for the investment was estimated at 5–6 years. ‘Taking into account the system’s operational reliability, favourable life-cycle costs and the climate and sustainability targets for the wellbeing area, the choice fell on ground source heating,’ says Pyy.
Reliable heating for a critical building In facilities such as fire stations, building services are required to offer a particularly high level of operational reliability. The premises are on call 24 hours a day, and different parts of the building have very different operational requirements.

- – At the Leppävirta fire station, heating is required in, amongst other places, the equipment hall, the wash hall, the offices, the training and meeting rooms, and the staff welfare and break rooms. The ground source heat pump system is also used to keep the equipment yard free of ice, explains Deputy Fire Chief Juuso Aalto.

He says the station represents a significant improvement to staff’s day-to-day lives.
– This means everything to the staff. The previous temporary premises were cramped and impractical due to indoor air quality problems at the old facility, Aalto explains.
Cooling is also provided by the energy wells
In conjunction with the G-Eco ground source heat pump solution, which uses R290 refrigerant, a passive cooling system was also implemented, utilising the energy well field to cool the building during the summer. This solution improves indoor conditions, particularly in offices, meeting rooms, rest areas and break rooms.

The building utilises water-circulating underfloor heating solutions, ceiling radiators, fan coil units and other heat transfer solutions selected according to their intended use for the distribution of heating and cooling
Gebwell system supplied
The following were supplied to the Leppävirta rescue station:
- 2 x Gebwell G-Eco Core 80 ground source heat pumps
- 1,000 l Gebwell G-Energy Coil domestic hot water heater
- 1,000 l Gebwell G-Energy buffer tank
- an electric boiler to ensure peak power
- a heat exchanger for passive cooling
heat exchanger for keeping the outdoor area free of ice
Project overview
Project: Leppävirta rescue station
Location: Leppävirta
Developer: Pohjois-Savo Welfare Region
Completion: 2026
Floor area: 1,770 m²
Heating solution: ground source heat pump and passive cooling
Supply: A system comprising two Gebwell G-Eco Core 80 ground source heat pumps with storage tanks



More references
-
Commercial and industrial buildings · Public buildingsKuortane’s new swimming centre is heated using ground source energy
Kuortane’s new swimming centre is a demanding sports and swimming facility, where the large volume of pool water, high demand for domestic hot water…
-
Public buildingsThe fossil oil heating at Kämmenniemi School was replaced by ecological geothermal energy
Kämmenniemi School in Tampere abandoned oil heating and switched to climate-safe geothermal energy. The new system uses the natural refrigerant R290, providing a sustainable…
-
Public buildingsModern district heating technology for Oulu Main Library
Oulu Main Library has been under renovation since autumn 2022. During the three-year refurbishment, the entire building services system of the 1982 property was…
Planning a project like this?
Tell us about the building and capacity need and we will respond with sizing.
Request a quote